Mouse

Search

Contact information

Hotline
Address

[Head office] 215B Le Lam, Phu Thanh Ward, Ho Chi Minh City

[Registered business location] 15/39 Hoang Hoa Tham, Tan Binh Ward, Ho Chi Minh City

[Warehouse] 116A Quach Dinh Bao, Phu Thanh Ward, Ho Chi Minh City

[Technical workshop] 130 Quach Dinh Bao, Phu Thanh Ward, Ho Chi Minh City

Follow us

Services

Operation – Acceptance – Handover

At Tai Phuoc, we believe that every order and every device that reaches our customers contains our passion and dedication. The Operation – Acceptance – Handover service is born from that heart, ensuring that the pump system, motor, accessories and industrial equipment operate accurately, stably and durably from the first day. We are committed to providing safe operation, optimal performance and strict compliance with the manufacturer’s technical standards.

Professional 4-step process:

Step 1: Test run
Conduct a comprehensive test of operating parameters: flow, pressure, vibration, noise, temperature and motor/pump performancebefore handover. Ensure the equipment operates smoothly, stably and achieves optimal performance when delivered to customers.

Step 2: Technical acceptance
Detailed assessment of the entire system, confirming that the technical parameters meet the manufacturer’s standards, including: pump performance, pipeline pressure, leak-proof tightness, motor insulation capacity and related technical requirements.

Step 3: Training of operating personnel
Direct guidance, providing standard operating procedures, instructions for periodic maintenance and prevention of technical incidents, helping the staff to be proficient, minimizing risks during operation.

Step 4: Handing over complete technical documents
Providing CO, CQ, PK, warranty certificate, maintenance checklist, P&ID diagram and operating documents – transparent and complete, helping customers manage and operate equipment for a long time long.

 ⇒ Customers receive:

− Pumping system and equipment operate stably, ready for immediate operation.

− Skilled personnel, minimizing risks due to incorrect operations program.

− Transparent and complete technical documentation, easy to monitor performance and maintenance.

− Optimize operating and maintenance costs, avoid losses due to incorrect operation or equipment damage.

 ⇒Let Tai Phuoc accompany you from the beginning initial operation – to ensure your system achieves maximum efficiency, operates safely and has a long service life. Contact us now.

Frequently Asked Questions

This is not a formality, but an international standard technical process. Customers receive a system that is ready to operate immediately, minimizing the risk of early failure, and having full transparent records for management.

Trial operation focuses on checking actual parameters, while technical acceptance is a step of overall assessment, confirming that the system meets manufacturer standards and technical requirements: pump performance, pipeline pressure, leak-proof tightness, motor insulation capacity… This is transparent technical evidence for customers to confidently put the system into operation.

Many units only stop at delivery, but at Tai Phuoc, we consider this the stage that determines the life and performance of the equipment. If inspection, acceptance and instructions are ignored, risks such as leakage, incorrect pressure or incorrect operation can occur, causing great damage in terms of cost and time.

Deployment services

No data available

  • Monday - Friday: 8:00 - 17:30; Saturday: 8:00 - 12:00